TAPPI TIP 0402-28

TAPPI TIP 0402-28

Click here to purchase
This document describes how used iber-reinforced plastic (FRP) tanks and vessels should be formally inspected to determine their condition, which must be known to assess fitness for continued service. Three phases of inspection are defined external inspection when the vessel is in service; external and internal inspections when then the vessel is removed from service. All three inspection phases must be carried out for the inspection to be considered complete. Complementary inspection with acoustic emission testing (AET) also is discussed.This document does not discuss criteria for repair, repair methods and procedures, or criteria for assessing the fitness-for-service of FRP tanks and vessels.These inspection guidelines also can be applied to all laminated construction FRP components, including stacks, hoods, ducts, piping and dual laminate equipment; i.e., FRP with an integral thermoplastic corrosion barrier. Resin-based reinforced linings, which can be heavily filled with inert materials or glass- einforced laminates and are typically trowel or spray-applied, are not covered. However, where such linings are corrosion barriers the general principles described herein for determining their condition would apply.

Product Details

Published:
01/01/2007
Number of Pages:
12
File Size:
1 file , 470 KB
TAPPI TIP 0402-28

TAPPI TIP 0402-28

Click here to purchase
TAPPI TIP 0402-28 describes how used iber-reinforced plastic (FRP) tanks and vessels should be formally inspected to determine their condition, which must be known to assess fitness for continued service. Three phases of inspection are defined external inspection when the vessel is in service; external and internal inspections when then the vessel is removed from service. All three inspection phases must be carried out for the inspection to be considered complete. Complementary inspection with acoustic emission testing (AET) also is discussed.This document does not discuss criteria for repair, repair methods and procedures, or criteria for assessing the fitness-for-service of FRP tanks and vessels.These inspection guidelines also can be applied to all laminated construction FRP components, including stacks, hoods, ducts, piping and dual laminate equipment; i.e., FRP with an integral thermoplastic corrosion barrier. Resin-based reinforced linings, which can be heavily filled with inert materials or glass- einforced laminates and are typically trowel or spray-applied, are not covered. However, where such linings are corrosion barriers the general principles described herein for determining their condition would apply.

Product Details

Published:
2017
Number of Pages:
12
File Size:
1 file , 340 KB

You may also like

TAPPI T275 sp-23

TAPPI T275 sp-23

Screening of pulp (Somerville-type equipment)standard by Technical Association of the Pulp and Paper Industry, 06/01/2023

TAPPI TIP 0402-32

TAPPI TIP 0402-32

Guidelines for Thermal Spray Coatings Installed to Prevent Corrosion in Pulp Mill Process Equipmentstandard by Technical Association of the Pulp...

TAPPI T271 om-23

TAPPI T271 om-23

Fiber Lenth of Pulp and Paper by Automated Optical Analyzer Using Polarized Lightstandard by Technical Association of the Pulp and...

TAPPI T 551 om-23

TAPPI T 551 om-23

Thickness of Paper and Paperboard (Soft Platen Method)standard by Technical Association of the Pulp and Paper Industry, 06/01/2023

Back to Top