EEMUA Publication 206

EEMUA Publication 206

Click here to purchase
The risk based approach to inspection of industrial plant is now an accepted practice. It is possible to determine and monitor consistently the mechanical integrity of industrial plant, or other such engineering assets, by using risk based methodologies. This guide has been written by industry to enable use of risk-based inspection (RBI) to its best effect. EEMUA 206 has been developed with assistance from the GB Health & Safety Executive and will help businesses to interpret and use the HSE Report ‘Best Practice for Risk Based Inspection as a Part of Plant Integrity Management’.

Product Details

Edition:
1
Published:
08/01/2006
Number of Pages:
28
File Size:
1 file , 310 KB

You may also like

EEMUA Publication 246

EEMUA Publication 246

Guidelines for managing ignition risk by inspection of Ex electrical equipment in hazardous areas (including support of IEC 60079-17)standard by...

EEMUA Publication 243

EEMUA Publication 243

Guide to Mechanical Connector Selection and Lifecyclestandard by Engineering Equipment and Materials Users Association, 12/01/2021

EEMUA Publication 236

EEMUA Publication 236

Risk management of legacy systems with potential for excess overpressurestandard by Engineering Equipment and Materials Users Association, 03/01/2018

EEMUA SAFed PEDG2/EEMUA 245 – Edition 1

EEMUA SAFed PEDG2/EEMUA 245 – Edition 1

UK Pressure Equipment A guide to pressure system installation where site assembly is required under the control of the end...

Back to Top