CSA Z318.2-95 (R2001)

CSA Z318.2-95 (R2001)

Click here to purchase
1. Scope

1.1

General This Standard applies to the commissioning of building control systems in health care facilities. It is a companion document to the other Standards in the CSA Z318 Series of Standards.

1.2

This Standard identifies the role of the commissioning team in the design, construction, and implementation of the building control system.

1.3

This Standard is intended to assist the commissioning team in the preparation of a commissioning plan. The commissioning plan specifies commissioning requirements and project coordination for newly installed or renovated building control systems. It includes (a) the human and financial resources required to accomplish commissioning; and (b) the responsibilites of the commissioning team; and (c) the timing and integration of the commissioning process.

1.4

Limitations This Standard does not cover the control devices of stand-alone or specialty medical equipment, eg, the remote controls of an angiography suite, on the premises of a health care facility.

Product Details

Published:
02/11/2000
Number of Pages:
121
File Size:
1 file , 4.3 MB

You may also like

CSA C22.2 NO. 80601-2-13:23

CSA C22.2 NO. 80601-2-13:23

Medical electrical equipment — Part 2-13: Particular requirements for basic safety and essential performance of an anaesthetic workstation (Adopted ISO...

CSA O125:23

CSA O125:23

Mechanically laminated timber — Production and qualification specificationsstandard by CSA Group, 04/27/2023

CSA Z21.89:23/CSA 1.18:23

CSA Z21.89:23/CSA 1.18:23

Outdoor cooking specialty gas appliancesstandard by CSA Group, 06/24/2023

CSA C865.1:23

CSA C865.1:23

Light-emitting diode drivers — Methods of measurement (Binational standard with NEMA ANSI C82.16-2023)standard by CSA Group, 06/29/2023

Back to Top