ANS 58.8-1994 (R2017)

ANS 58.8-1994 (R2017)

Click here to purchase
Establishes time response design criteria for safety-related operator actions to be used in design of light water reactor nuclear power plants. Specifies time requirements that are to be met to receive credit in the safety analysis for operator actions.

Product Details

Published:
08/23/1994
Number of Pages:
28
File Size:
1 file , 2.2 MB

You may also like

ANS 8.21-2023

ANS 8.21-2023

Use of Fixed Neutron Absorbers in Nuclear Facilities Outside Reactorsstandard by American Nuclear Society, 06/20/2023

ANS 19.3-2022

ANS 19.3-2022

Steady-state Neutronics Methods for Power Reactor Analysisstandard by American Nuclear Society, 01/01/2023

ANS 58.6-1983

ANS 58.6-1983

Criteria for Remote Shutdown for Light Water Reactorsstandard by American Nuclear Society, 02/17/1983

ANS 19.6.1-1985

ANS 19.6.1-1985

Reload Startup Physics Tests for Pressurized Water Reactorsstandard by American Nuclear Society, 12/13/1985

Back to Top