PIP PLE00007

PIP PLE00007

Click here to purchase

The purpose of this document is to provide guidance for the design and installation, maintenance, and operation of in-service pipeline pigging facilities. A pigging facility permits the operator to run pipeline pigs for corrosion control, in-line inspection, and flow assurance programs.
This engineering practice covers the design and installation of in-service pipeline pigging facilities for all new and existing pipelines. If there are conflicts between this specification, Owner’s requirements, Industry standards and regulatory requirement, the most stringent requirements shall apply.
This practice does not apply to temporary construction launchers/receivers or launchers/receivers for offshore use.
The installation of “temporary” pig traps shall be performed under the control of a MOC process that includes operations, engineering and safety design reviews.

Product Details

Published:
04/01/2021
Number of Pages:
26
File Size:
1 file , 430 KB

You may also like

PIP PN01LT0F01

PIP PN01LT0F01

Piping Material Specification 1LT0F01, Class 150, Flanged, PTFE-Lined Carbon Steel Process [Complete Revision]standard by Process Industry Practices, 10/01/2022

PIP PN01SD1B01

PIP PN01SD1B01

Piping Material Specification 1SD1B01 Class 150, 316/316L Stainless Steel, 0.063" C.A. Process [Complete Revision]standard by Process Industry Practices, 11/01/2022

PIP CVS02350

PIP CVS02350

Roadway and Area Paving Construction Specification [Complete Revision]standard by Process Industry Practices, 10/01/2022

PIP ELEGL09

PIP ELEGL09

Electrical Power System Event Reporting Guideline [New Practice]standard by Process Industry Practices, 11/01/2022

Back to Top