PIP CVE02020

PIP CVE02020

Click here to purchase
This Practice provides design considerations to engineers designing liquid containment pits, holding ponds, and basins. It includes civil, geotechnical, and hydrological engineering aspects, specifically addressing pits lined with geomembranes.

Product Details

Published:
08/01/2020
Number of Pages:
8
File Size:
1 file , 110 KB

You may also like

PIP PN01LT0F01

PIP PN01LT0F01

Piping Material Specification 1LT0F01, Class 150, Flanged, PTFE-Lined Carbon Steel Process [Complete Revision]standard by Process Industry Practices, 10/01/2022

PIP PN01SD1B01

PIP PN01SD1B01

Piping Material Specification 1SD1B01 Class 150, 316/316L Stainless Steel, 0.063" C.A. Process [Complete Revision]standard by Process Industry Practices, 11/01/2022

PIP CVS02350

PIP CVS02350

Roadway and Area Paving Construction Specification [Complete Revision]standard by Process Industry Practices, 10/01/2022

PIP ELEGL09

PIP ELEGL09

Electrical Power System Event Reporting Guideline [New Practice]standard by Process Industry Practices, 11/01/2022

Back to Top