ISA 77.43.01-2002 (R2008)

ISA 77.43.01-2002 (R2008)

Click here to purchase
The scope of this document is to address the unit/plant demand development subsystem for boilers withsteaming capacities of 200,000 lbs/hr (25 kg/s) or greater. This subsystem includes firing rate demanddevelopment, throttle/header pressure control, and unit megawatt/steam flow control as applicable.

This document will address two types of process applications:

a) a single boiler supplying a single turbine, typical of an electric utility power plant; and
b) a single boiler or multiple boilers supplying a common distribution header, typical of an industrialpower plant.

Specifically excluded from consideration are:

a) dispatch control;
b) turbine/generator control (other than turbine demand);
c) combustion controls (covered separately by ANSI/ISA-77.41-1992, Fossil Fuel Power Plant BoilerCombustion Controls);
d) steam distribution control systems;
e) economic loading of boilers; and
f) fluidized bed boilers.

Product Details

Published:
12/30/2002
ISBN(s):
9781934394731
ANSI:
ANSI Approved
Number of Pages:
30

You may also like

ISA 95.00.08-2020

ISA 95.00.08-2020

Enterprise-Control System Integration − Part 8: Information Exchange Profilesstandard by The International Society of Automation, 05/08/2020

ISA 95.00.05-2018

ISA 95.00.05-2018

Enterprise-Control System Integration - Part 5: Business-to-Manufacturing Transactionsstandard by The International Society of Automation, 12/03/2018

ISA TR84.00.03-2019

ISA TR84.00.03-2019

Mechanical Integrity of Safety Instrumented Systems (SIS)standard by The International Society of Automation,

Automation and Control Systems Economics, 2nd Edition

Automation and Control Systems Economics, 2nd Edition

Book by The International Society of Automation, 01/01/2006

Back to Top