ANS 2.23-2016

ANS 2.23-2016

Click here to purchase
ANS 2.23-2016 describes actions that the owner of a nuclear power plant shall take to prepare for and respond to a felt earthquake at the plant(s), including the need for plant shutdown; actions to determine the readiness of the plant to resume operation; and those evaluations necessary to verify the long-term integrity of safety-related and important structures, systems, and components. It also includes a consensus definition of operating basis earthquake exceedance, beyond which U.S. regulations require plant shutdown. Application of this revised standard provides a comprehensive, balanced plan for the response of a nuclear power plant to an earthquake.

This standard does not cover those operator actions that are performed in connection with safe operation and control of the nuclear power plant during and following an earthquake. These operations are specified in plant operating procedures, emergency procedures, alarm response procedures, and other conditions of the plant’s license. Likewise, it does not cover required reporting and communications with the U.S. Nuclear Regulatory Commission. It is not applicable to nuclear facilities other than licensed nuclear power plants.

Keywords: BWR boiling water reactor, nuclear power plant design, nuclear facility operations, PWR pressurized water reactor

Product Details

Published:
04/07/2016
ANSI:
ANSI Approved
Number of Pages:
59
File Size:
1 file , 850 KB
Redline File Size:
2 files , 7.5 MB

You may also like

ANS 8.21-2023

ANS 8.21-2023

Use of Fixed Neutron Absorbers in Nuclear Facilities Outside Reactorsstandard by American Nuclear Society, 06/20/2023

ANS 19.3-2022

ANS 19.3-2022

Steady-state Neutronics Methods for Power Reactor Analysisstandard by American Nuclear Society, 01/01/2023

ANS 19.6.1-1985

ANS 19.6.1-1985

Reload Startup Physics Tests for Pressurized Water Reactorsstandard by American Nuclear Society, 12/13/1985

ANS 58.6-1983

ANS 58.6-1983

Criteria for Remote Shutdown for Light Water Reactorsstandard by American Nuclear Society, 02/17/1983

Back to Top